Project
Description
SR120/Union Road Interchange Project
1st Diverging Diamond Interchange (DDI) in California.
1st Diverging Diamond Interchange (DDI) in California.
The City of Manteca in partnership with Caltrans District 10 and SJCOG are working to improve safety and traffic flow at interchange located at State Route 120 and Union Road. The project will improve safety conditions by constructing new on and off ramps, widening Union Road to 4 lanes between Daniels Street and Lifestyle Street, and providing a Class I shared-use path and Class II bike lanes.
The new interchange reduces conflict points between vehicles and moves traffic more efficiently through the interchange. The DDI is unique in that traffic on the local road is shifted to the left side of the road, before being shifted back to the right. Eliminating any left hand turns through the intersection. Upgrading to the unique DDI configuration provides significant cost savings and safety benefits for both vehicles and pedestrians.
Union Road is a key crossing of State Route 120 in the City’s bicycle master plan. The new Class I path will provide a 10-foot wide grade-separated trail that eliminates all bicycle/vehicle conflict points within the interchange to provide safe and efficient passage for bicycles, pedestrians, and other non-motorized travel.
Auxiliary lanes will be constructed between Airport Way and Main Street on eastbound and westbound State Route 120 to provide for increased traffic flow during peak times.
Benefits of a
Diverging Diamond Interchange (DDI)
Diverging Diamond Interchange (DDI)
Safety is a priority. This Diverging Diamond Interchange will reduce the number of conflict points from the existing 26 down to 14. Most importantly, the more severe collision types (crossing/T-bone) are reduced form 10 down to two.
Existing overpass does not have designated pedestrian or bicycle access. The new interchange will provide a Class I shared-use path and Class II bike lanes. The new Class I path will provide a 10-foot wide grade-separated trail that eliminates all bicycle/vehicle conflict points within the interchange providing safe and efficient passage for bicycles, pedestrians, and other non-motorized travel.
Cost effective solution allows for the project costs to be greatly reduced compared to other interchange types. Also allows for the existing bridge to remain.
Improved traffic operations on Union Road. This project will construct auxiliary lanes on State Route 120 from Airport Way to Main Street.
Compact footprint by eliminating right of way acquisition.
Class I grade separated shared use path improves pedestrian and bicycle mobility. This accomplishes the City’s General Plan goal and closes a significant gap in the pedestrian network.
Safety is highly increased with a DDI due to a reduction in collision points from 26 to 14 and separate bicycles and pedestrian lanes.
Construction
Schedule
Project Schedule
June 25, 2019 | Groundbreaking Event |
July 2019 | Construction Begins |
November 25, 2020 | New DDI opens |
Project Notes
- Delays are anticipated weekdays between 6:00am – 4:00pm on Union Road between Atherton Drive and Daniels Street. Please be aware of increased truck traffic in the area as a result of the interchange improvements.
- Traffic Detours and Closures will be posted in advance on this website in the Updates Section and the City of Manteca Facebook Page.
- Work will generally take place between 6 a.m. and 5 p.m. Monday through Friday. Night and/or weekend work may occur as necessary.
Project Hotline: 209.707.3470
Project
Updates
SR 120 at Union Road Ramp Closure Update
Please be advised that eastbound and westbound SR120 at Union Road will have ramp closures between February 19th and December 31, 2020.
Road Closure Details
Wednesday, February 19
Westbound Union Road on-ramp will be closed through December 2020
Sunday, February 23
Eastbound Union Road off-ramp will be closed through December 2020
February 19 – 20
Expect intermittent NIGHT lane closures on westbound and eastbound SR 120 from 10:00pm to 5:00am for striping changes and lane shifts.
Ramp Closure Detour: Access to Highway 120 via Airport Way and Main Street
Please expect delays and proceed with caution to ensure the safety of the traveling public and construction crews.
Call the project hotline with any questions or concern and a project team member will get back to you – 209.707-3470.
We apologize in advance for any inconvenience.
PG&E work begins at SR120/Union Road Interchange Project February 15
PG&E Night Work Road Closure Alert
Saturday, February 15
Full road closure Westbound and Eastbound on SR120 and closure of Union Road Overcrossing from 10:00pm to 5:00am.
Sunday, February 16
Eastbound off ramp closure from SR120 to Union Road 10:00pm to 5:00am.
Monday, February 17
Westbound on ramp closure from Union Road to SR120 10:00pm to 5:00am.
Please expect delays and proceed with caution to ensure the safety of the construction crews!
We appreciate your patience and apologize for any inconvenience.
Thank you!
Construction Update and Night Work Closures
Westbound bridge demo work has been completed. Night Work Road Closure Alert.
As of Tuesday, January 15, 2020, Westbound bridge demo work has been completed.
Night Work Road Closure Alert: Friday and Saturday, January 17 & 18, PG&E crews will be working on Southbound Union Road and Westbound 120 on-ramp.
Closure begins 10:00pm, Friday the 17th and ends 10:00pm, Saturday the 18th.
– Westbound on-ramp will be closed
– Southbound Union Road, Westbound turn lane south of Daniels will be closed
Traffic alerts are also posted on the project website, www.mantecaDDI.net.
We encourage you to sign up for email alerts or call the project hotline at 209.707.3470 with any questions or concerns.
Thank you!
Road Closure Alert: Monday, January 13
Please be advised that the City of Manteca construction crews are continuing work at Union Road and State Route 120
State Route 120: NIGHTLY CLOSURES
EASTBOUND: Monday, January 13 until Friday, January 17
10:00PM – 6:00AM
WESTBOUND: Monday, January 13 until Friday, January 17
10:00PM – 5:00AM
On ramps and off ramps at Union Road will remain open. Drivers will be redirected around the SR120 closure.
Anticipate construction noise during bridge demolition activities between 10 PM and 6 AM.
Construction activities may be cancelled in the event of rain.
Please proceed with caution to ensure your safety and the safety of the construction crews!
Thank you!
Community Meeting – January 8, 2020
SR120/Union Road Interchange Project 6:00 pm – 7:00 pm
PROJECT OBJECTIVE: The City of Manteca is constructing the Union Road/State Route 120 interchange to enhance circulation and mobility, and provide operational improvements.
DESCRIPTION: The Project will construct new on & off-ramps, widen Union Road to 4-lanes between Daniels Street and Lifestyle Street, and provide a Class I shared-use path and Class II bike lanes. Additionally, auxiliary lanes will be constructed between Airport Way and Main Street on eastbound and westbound State Route 120.
DISCUSSION: The Project Team with the City of Manteca will provide an update of the construction sequencing, possible ramp closures and detours, new bike and pedestrian paths, and schedules for the 1st Diverging Diamond Interchange (DDI) in California.
DATE: January 8, 2020
TIME: 6:00 pm – 7:00 pm
LOCATION: Manteca Transit Center at 220 Moffat Boulevard, Manteca, CA 95336
For more information please contact Koosun Kim, PE at City of Manteca Public Works 209.456.8419 or KKim@ci.manteca.ca.us or Manteca Transit at 209.456.8888
JOIN OUR MAILING LIST
Keep Up-To-Date on Project Details
Fill in the form below to be added to our newsletter.