Project
Description
SR120/Union Road Interchange Project
1st Diverging Diamond Interchange (DDI) in California.
1st Diverging Diamond Interchange (DDI) in California.
The City of Manteca in partnership with Caltrans District 10 and SJCOG are working to improve safety and traffic flow at interchange located at State Route 120 and Union Road. The project will improve safety conditions by constructing new on and off ramps, widening Union Road to 4 lanes between Daniels Street and Lifestyle Street, and providing a Class I shared-use path and Class II bike lanes.
The new interchange reduces conflict points between vehicles and moves traffic more efficiently through the interchange. The DDI is unique in that traffic on the local road is shifted to the left side of the road, before being shifted back to the right. Eliminating any left hand turns through the intersection. Upgrading to the unique DDI configuration provides significant cost savings and safety benefits for both vehicles and pedestrians.
Union Road is a key crossing of State Route 120 in the City’s bicycle master plan. The new Class I path will provide a 10-foot wide grade-separated trail that eliminates all bicycle/vehicle conflict points within the interchange to provide safe and efficient passage for bicycles, pedestrians, and other non-motorized travel.
Auxiliary lanes will be constructed between Airport Way and Main Street on eastbound and westbound State Route 120 to provide for increased traffic flow during peak times.
Benefits of a
Diverging Diamond Interchange (DDI)
Diverging Diamond Interchange (DDI)
Safety is a priority. This Diverging Diamond Interchange will reduce the number of conflict points from the existing 26 down to 14. Most importantly, the more severe collision types (crossing/T-bone) are reduced form 10 down to two.
Existing overpass does not have designated pedestrian or bicycle access. The new interchange will provide a Class I shared-use path and Class II bike lanes. The new Class I path will provide a 10-foot wide grade-separated trail that eliminates all bicycle/vehicle conflict points within the interchange providing safe and efficient passage for bicycles, pedestrians, and other non-motorized travel.
Cost effective solution allows for the project costs to be greatly reduced compared to other interchange types. Also allows for the existing bridge to remain.
Improved traffic operations on Union Road. This project will construct auxiliary lanes on State Route 120 from Airport Way to Main Street.
Compact footprint by eliminating right of way acquisition.
Class I grade separated shared use path improves pedestrian and bicycle mobility. This accomplishes the City’s General Plan goal and closes a significant gap in the pedestrian network.
Safety is highly increased with a DDI due to a reduction in collision points from 26 to 14 and separate bicycles and pedestrian lanes.
Construction
Schedule
Project Schedule
June 25, 2019 | Groundbreaking Event |
July 2019 | Construction Begins |
November 25, 2020 | New DDI opens |
Project Notes
- Delays are anticipated weekdays between 6:00am – 4:00pm on Union Road between Atherton Drive and Daniels Street. Please be aware of increased truck traffic in the area as a result of the interchange improvements.
- Traffic Detours and Closures will be posted in advance on this website in the Updates Section and the City of Manteca Facebook Page.
- Work will generally take place between 6 a.m. and 5 p.m. Monday through Friday. Night and/or weekend work may occur as necessary.
Project Hotline: 209.707.3470
Project
Updates
Road Closure Alert UPDATE: Wednesday, December 11, 2019
State Route 120: NIGHTLY ROAD CLOSURES
All SR120/Union Road construction activities have been cancelled for the remainder of this week.
Future traffic alerts will be updated on the project website, www.mantecaDDI.net. You can also sign up for email alerts or call the project hotline at 209.707.3470 with any questions or concerns.
Thank you!
SR 120/Union Road Closure Update for Week December 9, 2019
State Route 120: NIGHTLY ROAD CLOSURES
Monday, December 9 – CANCELLED
Tuesday, December 10 – Thursday, December 12
Nightly Closure Time: 10:00pm – 6:00am.
Westbound closure at SR120 and Union Road continues Tuesday, December 10th. Once completed closure will move to Eastbound SR120.
Eastbound closure is estimated to begin Wednesday night.
Construction activities may be cancelled in the event of rain.
Please proceed with caution to ensure your safety and the safety of the construction crews!
Important: On ramps and off ramps at Union Road will remain open. Drivers will be redirected around the SR120 closure.
Thank you!
December 4 to December 8 SR120 Road Closure Update
Expect Traffic Delays
Please be advised that the City of Manteca construction crews are continuing work at Union Road and State Route 120.
State Route 120: Road Closures
Wednesday, December 4 – 10:00pm – 6:00am
Full closure Eastbound only to install temporary signs and remove two overhead signs. No work on Westbound roadway will be done tonight.
Thursday, December 5
No scheduled road closures.
Sunday, December 8 through – Thursday, December 12
Nightly road closures are scheduled. Please check back daily for specific closure location and timing.
Please check the City of Manteca Facebook Page and/or the project website for regular updates www.MantecaDDI.net.
Construction activities may be cancelled in the event of rain.
Please proceed with caution to ensure your safety and the safety of the construction crews!
Important: On ramps and off ramps at Union Road will remain open. Drivers will be redirected around the SR120 closure.
Thank you!
Road Closure Alert – Expect Traffic Delays
Please be advised that the City of Manteca
construction crews are continuing work at Union
Road and State Route 120.
State Route 120: NIGHTLY CLOSURES
EASTBOUND
Monday, December 2 until Friday, December 6
10:00PM – 6:00AM
WESTBOUND
Monday, December 2 until Friday, December 6
10:00PM – 5:00AM
Please Note: On ramps and off ramps at Union Road will remain open. Drivers will be redirected around the SR120 closure.
Anticipate construction noise during bridge demolition activities between 10 PM and 6 AM.
Construction activities may be cancelled in the event of rain.
Please proceed with caution to ensure your safety and the safety of the construction crews.
The City of Manteca is committed to providing timely notifications to area residents and the traveling public. All construction related activities, key information and updates will be posted on the project website or you can contact the project hotline at 209.707.3470 and a project team member will get back to you.
Thank you!
Traffic Alert – Expect traffic delays November 17
Date: Sunday, November 17
Please be advised that City of Manteca construction crews will be continuing work at Union Road and State Route 120 on Sunday, November 17. Expect traffic delays.
Union Road Overcrossing at State Route 120: Traffic will be reduced to a single lane with traversing traffic controls.
SUNDAY: 10:00PM–5:00AM
Eastbound traffic on State Route 120: 2-lane eastbound traffic will be reduced to a single lane.
SUNDAY: 10:00PM–6:00AM
No on or off ramps will be closed. Please proceed with caution to ensure your safety and the safety of the construction crews.
If you have any questions or concerns we invite you to contact the Project Team at www.mantecaddi.net or call the project hotline at 209.707.3470.
Thank you!
JOIN OUR MAILING LIST
Keep Up-To-Date on Project Details
Fill in the form below to be added to our newsletter.